窝窝 发表于 2010-10-2 22:27:52

VSM data box _ 工业工程网

OCT= Time ---------Operator Cycle Time
MCT= Time ---------Machine Cycle Time
D/R= Time ---------Drop Off Rate( How often a finished part is completed off the end of the process)
PLT= Time ---------Process Lead Time
BATCH= pieces----Batch Size
PTP = Time-------Process Time Per Piece
PEJ = %   ---------Reject Rate
U/T = %   ---------Uptime
C/O= Time ---------Changeover Time
EPE= Time ---------Every Part Every (How often every part number is run though the process,setup Wheel)
PITCH= Time------Pitch interval
T/T=Time   ------Takt Time
SH = #       ------Number of the shift this process is runkofzhang (2008-7-02 08:27:47)学习下!

哎,.真希望以后工作能用到啊!lostwarriors (2009-2-13 18:33:56)其中有一些是不经常用的

cxh11088 发表于 2021-1-7 11:50:03

请大声告诉我这是几楼

次生无悔 发表于 2021-1-7 12:09:07

工业工程已经深深的代入到了各个行业

meigui2009 发表于 2021-1-7 12:12:40

我是来刷分的,嘿嘿

1989zhutainlin 发表于 2021-1-7 12:20:11

等二十年 我还会回来看LZ的

gcdyyb 发表于 2021-1-7 12:23:51

云鲸机器人在哪有卖的

2835245 发表于 2021-1-7 12:44:30

好帖,来顶下

smy311 发表于 2021-1-7 12:48:51

多多发帖支持贴吧人气~

smallkey 发表于 2021-1-7 12:52:51

唉 这贴好玩儿

105917508 发表于 2021-1-7 12:56:18

加油!加油~
页: [1] 2 3 4
查看完整版本: VSM data box _ 工业工程网