ieclass 发表于 2010-2-18 09:32:20

OEE计算 英文版

最基本的,希望对大家有用 和老外解释就不用那么麻烦了。。。<br />
Calculating OEE<br />
The Formulas<br />
As described in World Class OEE, the OEE calculation is based on the three OEE Factors: Availability, Performance, and Quality. Here's how each of these factors is calculated.<br />
Availability<br />
Availability takes into account Down Time Loss, and is calculated as:<br />
Availability = Operating Time / Planned Production Time<br />
Performance<br />
Performance takes into account Speed Loss, and is calculated as:<br />
Performance = Ideal Cycle Time / (Operating Time / Total Pieces)<br />
Ideal Cycle Time is the minimum cycle time that your process can be expected to achieve in optimal circumstances. It is sometimes called Design Cycle Time, Theoretical Cycle Time or Nameplate Capacity.<br />
<br />
Since Run Rate is the reciprocal of Cycle Time, Performance can also be calculated as:<br />
Performance = (Total Pieces / Operating Time) / Ideal Run Rate<br />
Performance is capped at 100%, to ensure that if an error is made in specifying the Ideal Cycle Time or Ideal Run Rate the effect on OEE will be limited.<br />
Quality<br />
Quality takes into account Quality Loss, and is calculated as:<br />
Quality = Good Pieces / Total Pieces<br />
OEE<br />
OEE takes into account all three OEE Factors, and is calculated as:<br />
OEE = Availability x Performance x Quality<br />
It is very important to recognize that improving OEE is not the only objective. Take a look at the following data for two production shifts.<br />
<br />
OEE Factor

chujie 发表于 2021-3-23 09:50:55

过来看看的

diecbfva 发表于 2021-3-23 10:00:53

如果我爱上你的笑容。。。要怎么收藏拥有?

chinayyy 发表于 2021-3-23 10:11:10

我是个凑数的。。。

日尧 发表于 2021-3-23 10:17:40

谢谢楼主,共同发展

nuaayzj 发表于 2021-3-23 10:18:06

支持一下:lol

刘方 发表于 2021-3-23 10:24:10

帮你顶下哈!!

anyliuyang 发表于 2021-3-23 10:54:31

大爱工业工程

w19274 发表于 2021-3-23 11:07:17

不错,支持下楼主

suave_liu 发表于 2021-3-23 11:11:34

等二十年 我还会回来看LZ的
页: [1] 2 3 4
查看完整版本: OEE计算 英文版